Skip to main content

Shoes rack (Taobao)

Completion date: January 30, 2019

There are around 20-24 pairs of shoes (in the household) and my existing 4-tier shoe rack (used for 9 years) was long overloaded.  I looked on Taobao and one of the things this delivery was a brand new 10-tier shoe rack...and I get to assemble them.  Yes!

It's not a creation, but it's one of the "toolwoman's" fantasy to assemble new stuff!  Anyways, this shoe rack comes with 16cm per tier, but I asked for 2 other different heights, 21cm and 35cm (if I remembered correctly).  The original design was to have a fabric installed on each tier, but I really don't think it's necessary.  I think it would be bad to install it personally.

It was really easy to install, I didn't even use the little wooden hammer nor the gloves provided by the shop.  So the top 2 tiers are for the shoe boxes (about 10).  The rack was RMB $108.


Comments

Popular posts from this blog

DIY Keyboard drawer installation

Completion Date: May 24, 2020 Work from home has given me chance to use my DIY table (35cm*50cm) ever more than before.  I feel great, but I realize the fact that I don’t have enough space if I want to work on my iPad at the same time.  I bought this mini drawer tracks so I can create this space. Material:  - 10 inch (25cm) keyboard drawer tracks, 1 pair (Taobao, RMB12.5) - 24*36cm wooden board (left over I have at home) Steps: 1.  Stretch the keyboard tracks to full extent.  Fit the wooden board to the end of the track and mark the holes with pencil. 2. This is 2.5mm drill bit.  Drill pilot holes to the marked holes.  Do the same for the other side. 3. Take my table top out and flip upside down.  Fit the keyboard drawer and trace the outline and mark the holes with pencil.  Re-verify the keyboard outer edge aligns in parallel with the table top’s outer edge. 4. Drill the holes ...

Gear investigation: Banbao Lego crane

Completion date: May 16, 2020 1. Gear ratio: 8:24:40. The bottom wheel cranking the string at speed (8/24)*(24/40)=0.2x speed of the motor. 2. The top two wheels looks like pulley system to me, but I am not sure about the spinning speed of the top wheels, the first top wheel is slower than the bottom wheeler, that I observed. 3. The beginning of the bottom wheeling action is pulling less string because the circumference is small (less string winded).  So it pulls the string faster gradually as more string is added to the circumference. 4. Note I added the rewind crank on the other side of the motor. This is the final instruction of the Banbao booklet. All the builds have been fun for me, I got to know more about gears now (though still primitive). My thoughts towards the gear mechanism is that it is not as efficient as I thought it would be. - requires many gears to do 1 simple thing - gear design has to match the many requirements of the space, dist...

Star cushion

Completion date: Jun 12 2020 Steps 1. Trace the star shape onto the fabric.  Double over the fabric.  Apply pins to secure the edges.  Cut out. 2. Install a platform on the sewing machine.  3. Whenever I need to turn the fabric I place the needle down on the fabric before turning the fabric.  Sew until I get a 15 cm opening. 4. Flip the fabric inside out and put the foam filling inside the star cushion.  Bind off the opening by hand sewing. My daughter requested for a star cushion.  I recycled filling of a foam-type cushion into this one.  This was the first time I used a platform.  The table was not long enough but I put something underneath to support the platform.  She was pleased with it though it wasn’t pink as she originally requested.  Below in the picture was her little hand!