Skip to main content

Banbao Lego cable car: Gear investigation









Completion date: April 24, 2020

Observation:
- the gear ratio is 8:24:24:40:40:40=24:24, meaning speed times is 1:3:3:5:5:5=3:3
- the action is slowed when going from small to big gears.
- 2 identical gears on one axle.  It is to displace the gears so the motion can be passed on from the width of  motor to the width of the cable car station. However this could also be done if you have a thick gear.
- 2 different gears on one axle (40=24).  At 40-teeth gear, the motion speed was 5 times slower, and this speed is passed on to a 24 teeth gear.  In this case, I think the speed wouldn’t change on the 24 teeth, it is still 5x slower.  However, it would become interesting if another 40-teeth is put next to this 24-teeth. It would become even slower, but what is the math there?  How much times slower?  Would it be 5*(40/24)=8.33x slower than the first 8-teeth gear?
- two groups of gears (left and right) are now connected by one long axle. The motor turns both left and right groups, so even I took the axle out the thing still works the same.
- I reconnect the left and right gear groups with the long axle.  Then I take the right side’s gear out (the one that is on the motor), the whole thing still works the same.



Comments

Popular posts from this blog

Python script - pop-up reminder based on data from Excel

Completion date: December 17, 2018 Changes to the script (Dec 14 2018): 1. Used Date format to compare dates.  2. Show message for update AR if the date is overdue and due today. Changes to the script (Dec 17 2018): 1. Corrected the ws.max_row+1 to ws.max_row. 2. Changed to loop from bottom up (so the the newest records gets checked first) =========== The script =========== #! python3 -- Modified on Dec 17 2018 import openpyxl import tkinter.messagebox from datetime import date import os #Get the workbook, worksheet file = "AR.xlsx" wb  = openpyxl.load_workbook(file) ws  = wb['Sheet1'] #Iterate through the rows of column "Next update on" = Column D = 4, from bottom up (the newest record to oldest) for i in range(ws.max_row, 2, -1):     next_update_datetime = ws.cell(row=i, column=4).value     if (next_update_datetime is n...

Gear investigation: Banbao Lego crane

Completion date: May 16, 2020 1. Gear ratio: 8:24:40. The bottom wheel cranking the string at speed (8/24)*(24/40)=0.2x speed of the motor. 2. The top two wheels looks like pulley system to me, but I am not sure about the spinning speed of the top wheels, the first top wheel is slower than the bottom wheeler, that I observed. 3. The beginning of the bottom wheeling action is pulling less string because the circumference is small (less string winded).  So it pulls the string faster gradually as more string is added to the circumference. 4. Note I added the rewind crank on the other side of the motor. This is the final instruction of the Banbao booklet. All the builds have been fun for me, I got to know more about gears now (though still primitive). My thoughts towards the gear mechanism is that it is not as efficient as I thought it would be. - requires many gears to do 1 simple thing - gear design has to match the many requirements of the space, dist...

Fixing of retractable badge holder

Completion date: October 2, 2021 My retractable badge holder’s string is thinning and would be broken soon.   I cut it short.  Pull the rotten part out with a tweezer. Insert the string from this end.  Tie a knot.   Reinstall the silver triangle back.